Commercial

18 Canberra Avenue, Forrest

Completed
19 Sep 2012
Location
Forrest, ACT
Storeys
4
Area
9,550m²

__DESCRIPTION

This project comprises of a new office building of 4 storeys constructed over a 2 level basement carpark. The building was constructed with an integrated fitout to accommodate the Department of Human Services Executive Headquarters.

__OUR ROLE

Hydraulic Services Consultants directly engaged by the developer to undertake complete hydraulic design and documentation from pre-development application through to approval for construction documentation.

__HYDRAULIC FEATURES

• Onsite stormwater detention.
• Rainwater harvesting and re-use in toilet flushing and irrigation
• Water Sub-metering and leak detection system.
• Centralised gas hot water plant and reticulation.
• Syphonic roof drainage.
• Centralised electronic bathroom and shower control systems

__ENVIRONMENTAL FEATURES

• 4 Star Green Star Design rating targeted.
• 4 Star Green Star As Built rating targeted.
• 4.5 Star NABERS Rating targeted.